Project description

Organising education is one of the core tasks of Kortemark local authority. In the subdistrict of Zarren, the objective is to bring together the two sites on which the 'De Linde' primary school is located. A new site has been set aside for this building behind the existing school, which is the closest to the town centre. The local authority wants to restructure the residual zone in the area behind the existing school by siting a new school campus there, thereby giving the rear façade of the existing building a new allure. This existing building is of course intended to retain its function as nursery school within the overall concept.

The school focuses on the pupils' skills, creativity and attitude, and their emotional and social development. The school is intended to be an active community school for the neighbourhood, with an open culture and good communication. To fulfil these requirements, the local authority wants to invest in a new, multifunctional, sustainable and contemporary school building in green surroundings.

The project for the new building should, in addition to classrooms, also house a multipurpose hall/dining room with a kitchen, a gym, a staff room and an office.

The current number of pupils on the two campuses in Zarren is 211. In order to ensure a certain flexibility in the future and with an eye to housing construction projects in the immediate surroundings, the new building is to be based on a figure of 230 pupils. Translated into standards set by AGION (Agency for Educational Infrastructure), this corresponds to 1986 m² for the classrooms, 300 m² for the bicycle shed and 1840 m² for playgrounds (open and covered). In addition to the 'hard' infrastructure, the local context, integration with the existing school building and the layout of the grounds are also an important design assignment. The foundations of the project are sustainability and the efficient use of scarce government resources.

Budget: €2,155,980 (excl. VAT and fees ) for construction / €336,681 (excl. VAT and fees ) for grounds

Fees:

Architecture: min. 6%, max. 7%

Stability: min. 1%, max. 2%

Technical installations: min. 1%, max. 2%

Layout of grounds: min. 5.25%, max. 6%

Kortemark OO2706

All-inclusive design assignment for the construction of ‘De Linde’, a new local authority primary school, in Zarren, Kortemark.

Project status
Selected agencies
  • karel verstraeten ir. architect
  • Atelier M Architects + Planners, Ontwerpbureau Pauwels bvba
  • Havana architectuur
  • Puls architecten
Location

Stadenstraat 57, 8610 Kortemark

Timing project
  • Selection: 25 Mar 2014
  • First briefing: 15 May 2014
  • Second briefing: 5 Jun 2014
  • Submission: 4 Sep 2014
  • Jury: 16 Sep 2014
Client

Gemeentebestuur Kortemark

contact Client

Stefaan Vercooren

Contactperson TVB

Anne Malliet

Procedure

prijsvraag voor ontwerpen met gunning via onderhandelingsprocedure zonder bekendmaking.

External jury member

Bob De Wispelaere

Awards designers

5.000 € excl VAT per candidate- 4 candidates