Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Locatie Open Oproep 1931 © Tim Van de Velde

Luchtfoto © GDI-Vlaanderen

Luchtfoto © GDI-Vlaanderen

Project description

The school belongs to Flemish Community Education school group 3. A completely new school for primary education is to be built on the magnificent site located in the Antwerp Kempen. The school is situated in the centre of Zandhoven, 300 metres from the town square.

Leefschool 't Zandhofje is engaged in a special educational project. The term 'leefschool' refers to a school system that goes beyond traditional education. The children learn to live together; they discover the social framework within the school and their position in it. The vision translates into classes which are not strictly divided according to age, but instead into life groups in which children of two different ages are brought together.

We believe that learning happens most efficiently when children feel comfortable in their own skin and are highly involved in what is going on in the school. Our school must be a place that children are happy to attend, where they feel good and where they always receive the necessary positive attention. The school's maximum capacity is 220 pupils, with 88 in pre-school education and 132 in primary education.

The current outbuildings date from 1966 and are in urgent need of renovation. In the short term we are seeking an energy-efficient building built in compliance with a passive house standard, in the framework of the school's aim of promoting environmentally-aware education and providing an example. This is where education and technology meet.

The school must be a place that is pleasant to live in and where one can help build a 'warm' school based upon strong social relationships. The warmth of and for children is the starting point and forms the breeding ground for the creation of a pleasant environment which can be enjoyed by everyone at the school.

The open green space is one of the school's great assets. In addition to the creation of a compact school, its integration into the surrounding area is also an important focus of attention.

Please note: In their statement of motivation for each model project for which they apply three candidates must list reference projects from their portfolio. The following information must be supplied with respect to these reference projects: the client, a description and the cost price of the services and the estimated cost price of the completed project.

Overall fee core team 99,57 €/sq.m excluding VAT

Zandhoven OO1931

Integrated architecture assignment for the construction of a new building in compliance with the passive house standard, for ’t Zandhofje primary school in Zandhoven.

Project status
Selected agencies
  • A33 architecten bv - cvba
  • aha! bvba, VONK architecten , Xavier Avontroodt
  • Onix
Location

Liersebaan 51, 2240 Zandhoven

Timing project
  • Selection: 12 May 2010
  • First briefing: 3 Jun 2010
  • Second briefing: 28 Oct 2010
  • Submission: 13 Jan 2011
  • Jury: 27 Jan 2011
Client

School Invest

contact Client

Sabine Vannitsen

Procedure

prijsvraag voor ontwerpen met gunning via onderhandelingsprocedure zonder bekendmaking.

External jury member

Luc Reuse

Budget

2.174.207 € - total surface 1.649 sq.m. (excl. VAT) (excl. Fees)

Awards designers

5.000 € (excluding VAT) per prizewinner